PBOM Estimation
- For objects which are re-calculated for wire scheme and tower arrangement, click the Generate button to overwrite all manually modified PBOM parameters with newly generated PBOM. For objects that have not been re-calculated, do not click the Generate button.
- The PBOM can be downloaded as an Excel file with many rows. Check the data with the
PivotTable function. For details, follow the steps below:
- Click PivotTable to insert it in the current sheet.
- Click the PivotTable, and select the Material, Unit, and Quantity and Price columns.
- Drag the Material field to the Row area and Quantity to the Value area.
- Click Enter.
After the operation in PivotTable is completed, a table listing the engineering quantities is generated as shown in the figure below:
- Select cable model according to the following rules:
- If the cables are within the cable circuit in wind farm, select aluminum cable and use the aluminum cable database.
- If the cables are those from terminal station to substation, select copper cable and use the copper cable database.
- If the cables are those from turbine transformer to tower, select either aluminum or copper cable.