Parameter Setup

Basic Information



Select the scheme with substation capacity and voltage level according to the wind farm capacity. The different schemes selected might bring various impact to the cost and occupied area of substation.

The current-period or long-period capacity here refers to the current-period or long-period planned construction capacity of substation other than that of wind farm. The current-period or long-period planned construction capacity of substation refers to the main transformer capacity planned for the current-period or long-period construction.

Area



The substation occupied land area is recommended corresponding to the selected scheme.

The recommended area is the occupied land area within the preassembled substation wall. For traditional substations, expand the area in a proper proportion. If no domestic facilities, such as maintenance building or basketball court are to be constructed, add 10-20 m to the original length and width. If there is a plan to construct domestic facilities, such as maintenance building or basketball court, consult electric professionals for suggestions.