Designed Budget Estimation
In the designed cost estimation mode, you are enabled to modify the material price, but cannot edit the material engineering quantity of route, platform, tower, substation, and power line.
In the designed cost estimation mode, you are enabled to modify the material price, but cannot edit the material engineering quantity of route, platform, tower, substation, and power line.