Matching Electric Single-Line Graph
After you modify the electric single-line graph, perform the substation siting operation. If there is any existing substation object, match the electric single-line graph.
The substation object is classified into three categories: turbine transformer, self-built substation, and grid-connected substation. No match is needed for turbine transformers.
- To match self-built substation, ensure the ingoing and outgoing voltage levels are consistent.
- To match grid-connected substation, ensure the ingoing voltage level is the same as that in the access point and the accessed capacity does not exceed the accessible capacity of each access point bay and total accessible capacity of substation.Note: A substation can be matched for only once.