Access Plan Calculation
- Grid-connected substation
Only grid-connected substations that pass the access judgement are listed here.
- Calculation scope.
The scope should include turbine and grid-connected substation. You can set up inward and outward buffer.
- Calculation setup
When the total turbine capacity exceeds the total capacity of accessible grid-connected substations (that it, some turbine locations might be abandoned), choose to limit power of turbine to access more turbines. To calculate with limited power, ensure the WTG group owns the power production time series file.
- Result display
After the calculation is completed, the results of every access point in different grid-connected substations of WTG group are generated, and the electric single-line graph is automatically generated (If there has already been an existing one, it is overwritten by the newly generated one) and matched with grid-connected substations. Double-click the Access related economics tab to check the economic result details.