Version 7.0.0
Greenwich v7.0.0 has been released on 29th March, 2020.
Main updated modules are:
- New White&Black Template
- WRA
- Access Plan
- Bug Fix
Please check the user manual via this link.
For more information, please check the following content:
*New White&Black Template
- Development efficiency elevation: Reconstructed front-end architecture and enabled component development, which boosts the development efficiency by 20%+.
- Layout and color optimization: Adopted brand new color scheme and compact
                        and well-structured interface layout, which offers a fresh and bright visual
                        effect, expands more operation space for users, and highlights key information.
                            Figure: New Version  Figure: Old Version  
- Operation process simplification: Simplified user workflow and optimized
                        interaction experience, providing a more friendly wind farm design platform.
                            Figure: New Version  Figure: Old Version  
*WRA
- Optimized the overview page of WTG group by distinguishing turbine location
                        configuration and turbine model configuration, which laid a foundation for
                        the future optimization of operation mode. - In turbine location configuration, you can edit the hub height, X
                                and Y coordinate of the turbine(s)  
- In turbine model configuration, you can configure the turbine model
                                series, turbine model, applicable tower, operation mode, power
                                curve, noise curve, and component group of the turbine(s)  
 
- In turbine location configuration, you can edit the hub height, X
                                and Y coordinate of the turbine(s)
*Data Layers
- Google Map and Google Annotations are not accessible for users in China to avoid policy and legal risk.
*Economic Evaluation
- Upgraded the parameter template of the onshore centralized model and onshore
                        distributed model of economic evaluation.- Changed material expense to 10 RMB/kW
- Changed the default financing way to financing lease
- Changed subsidy postpone period to 4 years
 
*Access Plan
- Optimized the single line graph modification operations. - Click the substation to directly match it. The Match Substation button is removed
- Added the Connect Existing Objects function to connect the
                                empty object(s) to the existing object  
- Added the Delete the connection function to delete the
                                existing connection(s) by clicking the connected line  
 