A brief introduction to each chapter in this manual is shown as below:
Chapter Name | Introduction |
---|---|
Introduction to Greenwich Platform | Summarize the problems in the wind power industry, the Greenwich features and values, main functionalities, document structure, and preliminary knowledge. |
Greenwich Login | Introduce how to login the Greenwich platform。 |
Greenwich Fundamentals | Introduce the public modules and fundamental functions of Greenwich, including project menu, database, tools library, toolbar menu, operation pane, and so on. This chapter guides you to quickly get acquainted with Greenwich interfaces and basic operations. |
Wind Resource Arrangement | Introduce the application of macrositing and marcroplanning, and demonstrate the steps to select wind farm and turbines in a large-scale scope with reference to interface and tasks. |
Planning and Siting | Introduce the main modules covered in wind farm planning and siting, and demonstrate the operation and calculation of mast, map, CFD model, turbine model, AEP, and noise. |
Post-Assessment | Introduce the importance and value of post-assessment, and method to collect data and calculate EBA. |
Unit Project Design | Introduce the configuration, calculation and optimization of unit project, including turbine foundation design, route and platform design, access plan design, substation siting, power line design, and substation design. |
Budget Estimation | Introduce the configuration and calculation of wind farm engineering quantity and cost estimation, and how to generate and check the result. |
Economic Evaluation | Introduce the three approaches to configure and calculate wind farm benefit, and how to generate and check the result. |
Feasibility Study | Introduce the configuration and calculation of feasibility study report, and how to generate and check the report. |