In-Field Route
- For operation details of existing road network, refer to the section Out-Field Route.
- It is recommended to utilize existing road network as in-field route and reorganize and
expanse it. Due to delay of road network update, some in-field route might not be
applicable. Draw the existing route manually.
- For project in hilly area, avoid to locate the inf-field route at the hill side with
residents or water conservation site. In route scheme calculation, define these
sites as prohibited areas.
- For project in plain area, pay attention to wide rivers and avoid to cross the river with low-level road and bridge. In route scheme calculation, define these sites as prohibited areas.
- To utilize road networks reorganized or expanded in road coverage project, if residential areas are too much, across these areas with straight line route instead of right-angled turning.