Checking Calculation Results

  1. Check the substation siting scheme object in the project tree. The recommended substations are displayed in GIS.
    • The recommended points for respective candidate substations are shown as round points. The relevant recommended points for a candidate substation form a group and are ranked by recommendation extent named site 1, site 2, site 3, … One group is differentiated from other groups with a specific color.
    • The top 5 recommended points are marked as round points with white edge.
    • The grid-connected substation is marked with a blue grid-connected substation icon.
  2. (Optional) Select candidate substation(s) in the legend at the left bottom of GIS, only recommended points of selected substation(s) are displayed.
  3. Click a recommended point, the Create Substation button pops up.
  4. Click the Create Substation button to open the substation creation window and select relevant parameters for the substation.
  5. Click OK. A substation object is added in the project. For details about substation creation, refer to the section Drawing a Substation Point.
  6. Double-click the substation siting scheme object in the project tree.

    In the Overview page, you can see the cost information of all the recommended points, including coordinate, substation cost, estimated circuit cost, estimated outgoing circuit cost, estimated ingoing road cost, earth volume cost, and estimated total cost.

  7. Click the Export button at the right top to export this table.