Greenwich v6.2.0 has been released on 13th February, 2019.

Main updated modules are:

  • Support main crane recommendation
  • Support feasibility study report generation for 10kv power line design
  • Optimize the logic of AEP calculation and layout optimization
  • Optimize modifications on electric single-line design

Please check the user manual via this link.

For more information, please check the following content:

Platform and Hoisting Design

  1. Platform design supports forbidden zones , and adds input constraints of various cost zones.
  2. Add the design content of WTG hoisting, such as the recommending main crane.
  3. Design results: the output can include the quantity of demolition cost, the recommendation of hoisting method of each WTG position, etc .
  4. The platform name corresponds to the WTG name.

Power Line

  1. Feasibility study report update to support 10kV power line design and multi-voltage ( including 10kV and 35kV ) power line design

WRA

  1. Take into account the wake effect of the nearby wind farm when calculating AEP with Real Frequency.
  2. Avoid to locate the turbines at slopes over 17 degree when doing Layout Optimization at hilly project.

Access Plan

  1. Optimize modifications on electric single-line design and add verification on electric single-line graph operations and corresponding warning messages.