Version 8.5.0¶
Greenwich v8.5.0 has been released on November 22th, 2021.
Greenwich web domain *greenwich.ai* will be invalid on December 1st, 2021. The new website is *greenwich.envisioncn.com*. Please update your favorites address.
Main updated modules are:
- WRA
- Applicability Analysis
- Economic Evaluation
- Bug Fix
Please check the user manual via this link.
For more information, please check the following content:
WRA¶
- The map in power generation calculation is not mandatory. If users submit power generation calculation without selecting the map, the system will use the public library map to calculate the relevant terrain indicators.
- Support editing distributed features of turbine location and publishing to the data lake.
- Support calculating the distance between turbine location and road.
- The user can check whether AI modified model is applied to the wind speed from the overview page.
Applicability Analysis¶
- The component group is selected all by default
- Support cross-project CFD (RANS and DES) object references.
- Support load AI mode of complex mountain.
- Add load optimization function.
- Associate with contract QC after load optimization.
Economic Evaluation¶
- Change the premium rate to 0% in the self-development project template.
- Revise some index formulas of financial calculation.