Checking the Calculation Result
After the substation design is completed, check the basic design parameters in the operation pane, check the edit the substation entrance route and field leveling in GIS, and view and edit the PBOM result.
Checking Substation Design Basic Parameters
- Click the self-built substation object in the project pane.
- Click the expand 《 icon to open the operation pane. The basic parameters are displayed under the Calculation button.
Checking Entrance Route and Field Leveling Design
Checking PBOM Result
- Double-click the self-built substation object in the project pane. The PBOM page opens.
-
Add materials in the material tree.
- Select the material group No. and material No.
- Input the engineering quantity.
- Input the price.
- Click the + icon to add a material item.
- Click Save at the left top of this page to save the settings.
-
Edit the quantity and price.
- Double-click the cells under the Number and Price column to edit their values.
- Click Save at the left top of this page to save the settings.
-
Delete the material.
- Click the delete icon at the right end of an item to delete the respective material.
- Click Save at the left top of this page to save the settings.