Checking Route PBOM

After the engineering quantity optimization is completed, the PBOM details are provided in the PBOM page of route overview.

  1. Double-click the route scheme object in the Project pane. The Route page is opened.
  2. Click the PBOM tab to check the PBOM parameters.
  3. Expand the hierarchy of PBOM at the left side.
  4. Add materials in the material tree.
    1. Select the material group No. and material No..
    2. Input the engineering quantity.
    3. Input the price.
    4. Click the + icon to add a material item.
    5. Click Save at the left top of this page to save the settings.
  5. Edit the quantity and price.
    1. Double-click the cells under the Number and Price column to edit their values.
    2. Click Save at the right top of this page to save the settings.
  6. Delete the material.
    1. Click the delete icon at the right end of an item to delete the respective material.
    2. Click Save at the left top of this page to save the settings.