Task List

This section shows the task status submitted from the Operation pane, such as CFD model, map merge, noise calculation, and EBA online matching.

The Task List interface is shown as follows:

Figure: Task List Interface Overview
Table 1. Functional Areas in Task List
No. Name Description
Time selection Select the start and end date to show tasks submitted within this period.
Task type Select the task type, including Linear Model, CFD, CFDRans, AEP Calculate, Macro Planning,Macro Siting Pro, Map Matching, Noise Calculation, EBA Data Mapping, EBA Calculate, Mast Report, MicroSite Report, Wire Optimization, Tower Arrangement, Electric Check, Electric CAD, Substation Sitting, Turbine Foundation, Road Path Design, Road Quantities, Platform Design, CAD Map, Feasibility Report, Feasibility CAD, foundation CAD, Access plan, Economy map, RouteNet Calculate, Entrance route and platform design, and Calculation of entrance route and platform Engineering Quantity.
Check button Click this button to show tasks with the specified type and within the specified period in the table ④.
Task list Display basic information and status of calculation tasks.

In the User, Project, Name, Status column, input specific values to search for relative tasks. Click the X symbol to delete the respective search value.